Isometric drawing of a substation switchgear panel

Owned test kit. Not hired in.

We self-perform HV construction, protection, testing and commissioning from 11 kV to 132 kV, and we say plainly what we subcontract or leave to the network operator.

scope

Four disciplines between the network and the load.

stage-01

Construction

HV cable to 132 kV. We joint 11–33 kV in-house; 66–132 kV jointing is by OEM jointers. Civils are subcontracted and we do not build overhead lines.

stage-02

Protection & control

Design, IEC 61850 and SCADA/RTU integration. The network operator issues settings; we implement and test them.

stage-03

Commissioning

Pre-commissioning, SAT, switching programs and energisation. The network operator owns the energisation approval.

stage-04

Testing & maintenance

Primary and secondary injection, VLF, PD, SFRA and earth grid verification, with DGA by a NATA lab. HV maintenance with SEQ 24/7 call-out.

the kit

Plant, tooling, and the limits we state.

Substations and switchyards, self-performed to 132 kV.

Customer and zone substations at 11, 22 and 33 kV with AIS and GIS installation and transformers to 100 MVA, plus 66 and 132 kV AIS switchyards with earth grids to ENA EG-1. 275 kV is partnered from Year 2.

Voltage
11–132 kV
Transformers
To 100 MVA
Earth grids
ENA EG-1
Isometric wireframe technical drawing of an open industrial equipment cabinet with shelves and structural frames.
Wacol workshop
Rev 2026.07
Dark control room screen displaying multiple line, wave, and bar graphs with two orange markers.
Wacol test lab
Rev 2026.07

The test lab behind every energisation.

Primary and secondary injection, VLF, partial discharge and transformer testing run from a 500 m² lab at Wacol on equipment we own, so test dates are ours to schedule. Network settings come from the network operator; we implement and prove them.

Injection
2 primary, 6 secondary sets
VLF
2 sets, 0.1 Hz, 60 kV
Analysis
PD, SFRA, thermal

Limits stated up front.

Overhead lines, civils, steel, foundations and cranes are subcontracted or out of scope. 66–132 kV jointing is by OEM jointers, 275 kV is partnered from Year 2 and DGA is by a NATA lab. We say this at tender, not at claim time.

Overhead
Not in scope
275 kV
Partnered, Year 2
DGA
NATA lab
Isometric blueprint-style computer server racks linked by white network lines on dark background.
Scope limits
Rev 2026.07
The records

Every test we run is recorded and handed over. Nothing is asserted.

Owned, calibrated equipment means every injection, VLF and PD result traces to a test record and a settings file. What we hand over is what the asset did on the day, not what the drawings promised.

Closeup of electrical testing device clamped on copper busbar with red and black probe cables connected.
Test set on site
Rev 2026.07
Records
Every test
Handed over
Cadence
Weekly
Float report
Review
30 days
Pre-energisation
Witness
FAT
Plant factory test
equipment

Owned, calibrated, on our schedule.

Four numbers describe the test equipment in the year-one capital plan. It is committed spend, not a claim about past use, and nothing here is hired in to meet a date.

Year-one capital plan · owned equipment
owned
1.39
$m
Owned test equipment
primary
2
sets
Primary injection sets
secondary
6
sets
Relay test sets
VLF
2
sets
VLF 0.1 Hz, 60 kV sets
Test coverage

What a test record shows before we energise.

Insulation withstand
Illustrative plot
Relay trip timing
Illustrative plot
Illustrative test plot
specifications

Scope and limits.

Scope as planned for launch. Package-specific scope is confirmed at tender.

Self-performed
11 kV to 132 kV
Cable
Cable 11–132 kV; 66–132 kV jointing by OEM jointers
Substations
11, 22 and 33 kV, AIS and GIS, to 100 MVA
Switchyards
66 and 132 kV AIS, earth grid to ENA EG-1
Protection
IEC 61850, SCADA/RTU; NSP issues settings
Commissioning
Pre-comm, SAT, energisation; NSP approves
Maintenance
HV switchgear, transformers, relay test cycles
Territory
Queensland and northern NSW
Call-out
SEQ 24/7, 4-hour attendance target
Not in scope
Overhead lines; 275 kV until a Year 2 partner
Test equipment
$1.39m owned
Reporting
Weekly one-page float report
Standards & accreditation

ISO 45001 / 9001

Safety and quality management systems, held as dated targets rather than current certificates.

Powerlink

Pre-qualification to work on the transmission network.

Energy Queensland

Accredited service provider status for Energex and Ergon Energy work.

Essential Eight

Cyber controls for client and network data, targeted at Maturity Level 2.