Energised on the contracted date.

Kestrel Power builds, protects, tests and energises 11 kV to 132 kV substations and switchyards across Queensland and northern NSW. Launching 4 January 2027 from Wacol, Brisbane.

Kestrel Power builds, protects, tests and energises substations and switchyards for data centre operators, tier-one builders, network utilities and developers. Queensland's connection queue is congested, and we compete on schedule certainty and ESI depth, not on price.

why Kestrel Power

Built to hold dates. Engineered for the ESI.

Four commitments we hold to on every project, from design interface to handover.

0 LTI

Zero lost-time injuries, every site

Our safety target on every project, with one Site Supervisor accountable per site.

10 days

Long-lead plant ordered in 10 business days

Orders go out within 10 business days of design freeze, with FAT witnessed.

30 days

Readiness review before energisation

Protection, plant, approvals and test records checked 30 days before the date.

1 lead

Named commissioning lead from award

One accountable person from the first design review to energisation.

testimonial
01 / 03
Portrait placeholder for the Managing Director role
Managing Director
Kestrel Power
Scope
Energisation
Target
100% on date
From
Jan 2027
Quote Icon

“Queensland's connection queue is congested and data centre demand is running ahead of network capacity. Contractors who can energise on schedule are scarce. Kestrel Power is being built to be one of them, and to become the reference for HV delivery in Queensland.”

02 / 03
Portrait placeholder for the Head of Engineering role
Head of Engineering
Kestrel Power
Scope
Commissioning
Lead
Named
From
Award
Quote Icon

A named commissioning lead is on every project from the day of award. Not appointed at handover. Not borrowed from another job.

03 / 03
Portrait placeholder for the Commissioning Manager role
Commissioning Manager
Kestrel Power
Scope
Reporting
Cadence
Weekly
Format
1 page
Quote Icon

Every Friday, one page: critical path, network approvals, plant delivery and open defects. No surprises at energisation.

built for
capabilities

Complex energisations. Predictable dates.

We self-perform the work that decides the energisation date: three client groups, one accountable contractor.

Long corridor between rows of dark server racks in a dimly lit data center.
Data centres
Row of tall metal industrial control cabinets in a dimly lit factory or plant room.
Network utilities
Rows of large industrial electrical transformers and containers under dark, cloudy sky.
Developers & industry
performance

Delivery planned in numbers.

Kestrel is new, so these are plan figures, not a track record: year-one revenue, owned test equipment and the people we are hiring to deliver.

Status: Pre-launch
/
Launch: 4 Jan 2027
year one
26
$m
owned
1.39
$m
staffed
90
staff
Row of tall metal industrial control cabinets in a dimly lit factory or plant room.
Wacol depot / 8,000 m²