insight
.
Plan

Kestrel Power plans to start trading on 4 January 2027 with 14 staff.

Kestrel Power plans to start trading on 4 January 2027
Wacol depot, planned
21 Nov 2026

Kestrel Power plans to begin trading on 4 January 2027 as a Brisbane high-voltage power systems contractor: building, protecting, testing and energising substations and switchyards from 11 kV to 132 kV. This is a plan, not a completed milestone. The company has no completed projects yet.

The plan has 14 staff at the end of the first quarter, rising to 38, 64 and 90 at the end of each following quarter. Year-one revenue is planned at $26m, with a fourth-quarter run-rate of $48m a year, against $4.2m of year-one capital.

Why we start with the depot

The Wacol depot is 8,000 m²: 2,200 m² of workshop and stores, a 500 m² test lab, 500 m² of office and 4,800 m² of laydown. A satellite laydown yard of 2,000 m² at Yatala is planned from the third quarter of 2027. Of the capital, $1.39m is allocated to owned test equipment.

Schedule certainty is the product. Every energisation is planned against the contracted date.

Kestrel Power · Operating principle

Licences and accreditations are targets, not holdings: the Queensland electrical contractor licence before trading, Powerlink pre-qualification applied for in month 1 and targeted for approval in month 6, and ISO 45001 and ISO 9001 certification targeted for month 9.

What happens next

Month 1 is January 2027. Each target will be reported here as a dated Insight with its status stated as it is, including any target that slips.

We will report each milestone as planned, achieved or slipped. Nothing is claimed before it is true.

Kestrel Power · Reporting principle

Enquiries about packages can go to [email protected].

details
category
Plan
Published
21 Nov 2026
read
3 min
Reference
REF KP-INS-001