Why we own our test equipment instead of hiring it in.

Of the $4.2m year-one capital, $1.39m is allocated to owned test equipment: two primary injection sets, six secondary injection relay test sets, two VLF 0.1 Hz 60 kV sets, a partial discharge system, a transformer test suite and thermal cameras.
The equipment is to be housed in a 500 m² test lab at the Wacol depot. None of it has been purchased yet; this is the purchasing plan.
What owning changes
Hired-in test sets are booked against someone else's calendar and arrive with someone else's calibration history. Owned sets can be scheduled to the commissioning program, calibrated on our own cycle and kept at the depot between jobs. The same sets serve maintenance and testing work, planned at $150k–$1.5m a year per agreement.
Test equipment sits on the critical path, so it should be ours.
Kestrel Power · Operating principle
Some tests stay external by design: dissolved gas analysis goes to a NATA-accredited laboratory, and OEM jointers handle 66–132 kV cable joints.
What it costs us
Owning equipment adds fixed cost and calibration obligations. We accept that because a schedule certainty premium of 2–4% only works if testing does not slip.
Fixed cost is the price of not waiting for a hire set.
Kestrel Power · Operating principle
We will publish the test lab and calibration arrangements as they are established.